Pre-engineered steel buildings from China: drawings, codes and inspection
Coordinate design approval, material specifications and fabrication checks before purchasing a pre-engineered steel building from an Asian supplier.
By Packsel Consulting, Purchasing insights
Article date: · 4 min read
Updated:
Purchasing a pre-engineered steel building from China requires early coordination between the fabricator, buyer and project engineer. Design approval, material requirements and documentation should be resolved before fabrication, rather than left until the building-permit or installation stage.
The design has to work for your site
A steel building is designed for loads: wind, snow, seismic, roof live load, any cranes or equipment hung from the frame. In the U.S., these come from the building code your jurisdiction has adopted, usually a version of the International Building Code with loads from ASCE 7, plus any local amendments.
Most jurisdictions will want structural drawings and calculations sealed by an engineer licensed in that state. Confirm the required local engineering approval rather than relying on the supplier’s design stamp. Plan for one of two routes:
- The supplier’s design is reviewed, checked and sealed by a U.S. licensed engineer, who may require changes.
- A U.S. engineer designs the structure and the supplier fabricates to those drawings.
Either way, agree who does it and who pays before the order. Changes after fabrication starts are expensive.
What to put in the contract
- The governing code and edition, and the design loads for your site
- Who provides sealed drawings and calculations
- Steel grades, by ASTM or equivalent specification, for frames, purlins and bolts
- Welding code, for example AWS D1.1, and weld inspection requirements
- Coating system: primer, paint and film thickness, or hot-dip galvanizing
- Roof and wall panels: material, gauge, coating and colour
- Anchor bolts and foundation interface details
- Erection drawings and a complete packing list
Mill certificates and traceability
Ask for mill certificates for the plate and sections used, and check the grades against the drawings. See our guide to EN 10204 certificates. Steel substituted for a weaker grade is a real risk on price-driven orders.
Inspection during fabrication
Useful checkpoints:
- Material on arrival: grades, thicknesses and mill certificates
- Fit-up and welding: against the drawings and the welding procedures; see our article on welding quality
- Dimensions: hole spacing and member lengths, which decide whether the building goes together on site
- Coating: surface preparation, film thickness and adhesion before packing
- Marking and packing: every piece marked to match the erection drawings
A trial assembly of a frame bay at the factory, if practical, catches fit-up problems before they reach your site.
Shipping and site
Steel buildings usually ship in open-top or flat-rack containers for long members, or standard containers for panels. Protect painted steel from salt air with wraps and dunnage. On site, the erection crew needs the drawings, the packing list and a way to identify each piece quickly.
Common problems with imported steel buildings
- Drawings that were designed for loads lower than those required at the site.
- Steel grades substituted for cheaper ones.
- Holes drilled out of position, which stops pieces bolting together on site.
- Thin or poorly prepared coatings that rust in transit.
- Missing pieces or bolts, discovered only when the crew starts erecting.
Most of these can be found at the factory.
What we check during fabrication
When we follow a steel building order, we start with the material: grades, thicknesses and mill certificates against the drawings. We check fit-up and welding against the approved drawings during fabrication, measure hole spacing on sample members, and check coating thickness with a gauge. Before loading, we compare the packing list with what is actually on the floor, piece by piece, and confirm every piece carries the mark shown on the erection drawings.
Packsel Consulting sources steel building fabricators, checks material, welding and coatings during production oversight and coordinates with your engineer. We don’t provide engineering design or sealed drawings.
About these articles
Packsel Consulting
Purchasing insights · U.S. and Hong Kong
Practical guidance for U.S. businesses buying from Asia.
How we work