How to Import Machinery from China to the USA
A step-by-step guide to importing machinery from China: supplier checks, classification and duty, agency rules, payment, inspection, shipping, documents, and delivery.
By Packsel Consulting, Purchasing insights
Article date: · 3 min read
Updated:
To import machinery from China to the USA, verify the supplier, confirm the tariff classification and duty, check whether other agencies regulate the machine, agree payment tied to testing, inspect before shipment, and work with a freight forwarder and customs broker to ship and clear it. Planning these steps before you order avoids most delays.
1. Verify the supplier
Confirm the company exists, makes the machine, and has exported before. See how to verify a Chinese supplier.
2. Classify the machine and check the duty
Most machinery is classified in Chapters 84 and 85 of the Harmonized Tariff Schedule. Check normal duty and any additional duties, such as Section 301 duties on goods from China. See HTS codes for machinery.
3. Check other agency requirements
- EPA: machines with nonroad engines.
- FDA: laser products and some food equipment.
- FCC: equipment with digital electronics or radios.
- Electrical listings expected by your inspector.
4. Agree payment tied to testing
Link the main payment to a passed factory acceptance test.
5. Inspect before shipment
Check the machine against the specification and component list.
6. Pack and ship
Agree crating and ISPM 15 requirements.
7. Prepare documents and clear customs
Your broker will need the commercial invoice, packing list, bill of lading, ISF data, and any agency forms.
8. Plan delivery and installation
Arrange unloading, rigging, and installation.
Who does what
An import involves several parties, and each has a defined role:
- You, the importer of record: responsible for the declaration, duty, and compliance.
- The supplier: builds, tests, packs, and loads the machine, and provides documents.
- The freight forwarder: books transport and handles logistics.
- The customs broker: files the entry and agency forms on your behalf.
- Your purchasing representative: checks the supplier, the machine, and the documents, and coordinates the handoff.
Write down who owns each step at the start.
Timeline
A typical machinery import can take several months from first contact to installation. The longest stages are usually supplier selection, production, and ocean transit. Leave time for a factory acceptance test, possible corrections, and customs clearance.
Costs to include
Beyond the machine price, budget for:
- Inspection and testing.
- Crating and inland transport in China.
- Ocean or air freight and insurance.
- Duty, including any additional duties.
- Customs brokerage and fees.
- Delivery, rigging, and installation in the U.S.
- Spare parts and training.
Put them in a landed-cost estimate before you agree the price.
Common problems
- Engine or laser paperwork missing at the port.
- Crates without ISPM 15 marks.
- Commercial invoices with vague descriptions.
- Machines built for the wrong voltage.
- No plan for unloading a heavy crate at the site.
How we coordinate a machinery import
When we coordinate an import, we keep one list with every step, its owner and its date: supplier checks, the factory acceptance test, crating, booking, the documents for the broker, and delivery to site. We send the broker the engine, laser or electronics documents early, so nothing is missing when the ship arrives.
How Packsel Consulting can help
We support machinery imports from supplier search to shipping coordination. We work with your forwarder and customs broker and do not file customs entries.
For help with shipment readiness and documents, see our export and shipping coordination service.
Talk to us about an order. Tell us what you are buying, where the supplier is, and which stage you have reached.
About these articles
Packsel Consulting
Purchasing insights · U.S. and Hong Kong
Practical guidance for U.S. businesses buying from Asia.
How we work