Buying an excavator from China: what to inspect at the factory before it ships
A factory inspection checklist for excavators and related equipment, covering engine documentation, hydraulics, welds, cab protection and machine identification.
By Packsel Consulting, Purchasing insights
Article date: · 4 min read
Updated:
For an excavator purchase, testing a separate sample is rarely practical. The machine being inspected is usually the unit that will ship, making the factory visit an important opportunity to review condition, documentation and operation before delivery.
The following areas provide a starting point for an excavator inspection brief. Several also apply to wheel loaders, skid steers and backhoes, subject to the machine configuration and agreed test scope.
Paperwork first
Engine emissions. Nonroad diesel engines imported into the U.S. must be covered by an EPA certificate of conformity and carry an emission control label. Ask the factory for the engine make, model and family, and look the certificate up in EPA’s database before you order. At inspection, check the label on the engine matches. Machines with uncertified engines can be held at the port. Your customs broker will also need EPA’s engine import declaration (Form 3520-21) filed at entry; see EPA’s guide to importing vehicles and engines. Keep the supporting documents: EPA expects importers to hold them for at least five years.
Product identification number (PIN). Earthmoving machines carry a 17-character PIN to ISO 10261. Check it is stamped on the frame and on the plate, and that both match the commercial invoice.
Cab protection. Rollover and falling-object protection should be certified to the relevant standards, such as ISO 12117-2 for excavator ROPS. Ask for the certificate and check the label on the cab.
Manuals and decals. Operator and parts manuals in English, and safety decals in English.
Walk-around, cold
Before the engine is started:
- Structure: welds on the boom, arm, bucket linkage and undercarriage frame. Look for cracks, porosity, undercut and grinding over defects.
- Pins and bushings: grease points present and greased, pins retained properly.
- Undercarriage: track tension, rollers, idlers, sprockets. Steel or rubber tracks as ordered.
- Hydraulics: hoses routed without rubbing, fittings tight, no weeping at cylinders, pump or valve block.
- Components: record the brand and serial of the engine, main pump, swing motor and travel motors. Compare them with the specification you agreed. Cheaper substitutes are the most common deviation.
- Fluids: levels and the grades used.
- Paint: coverage, especially inside the boom and under the frame where rust starts.
Running checks
Warm the machine up, then:
- Start and idle. Smoke colour, unusual noise, warning lights, gauges and the display.
- Travel. Forward and reverse in both speeds, straight-line tracking, turning.
- Swing. Full rotations both ways, smooth start and stop, swing brake.
- Digging functions. Boom, arm and bucket through full strokes, alone and combined. Cycle times can be timed against the brochure figures.
- Holding. Raise a load or the boom and check for drift with the engine off over an agreed period.
- Auxiliary hydraulics for breakers or thumbs, if fitted.
- Safety: horn, lights, travel alarm, seat belt, pilot control lockout.
After running, look again for leaks. Hoses that are dry when cold often weep when hot and under pressure.
If the factory has a pressure gauge kit, ask for main relief pressure readings against the spec.
Put it in writing
The report should list every component serial, the test results with photos and video, and a punch list of anything to fix before shipment. Hold the balance payment until the punch list is closed and checked.
When an in-person visit is not possible
A live video walkthrough can provide additional information when an in-person visit is unavailable. Send the checklist beforehand, ask for the PIN plate and engine label on camera first, and keep the call recorded. A witnessed acceptance test is the stronger option.
How we use this checklist on site
We send this checklist to the factory before the visit, so the machine is ready for each test. On the day, we work through it in order, record a photo and a note against each line, and list anything that couldn’t be checked and why. For compact machines, see our guide to buying a mini excavator from China.
Packsel Consulting carries out pre-shipment inspections on construction equipment in China and across Asia, and verifies manufacturers before you order. We don’t certify emissions or ROPS; we check the documentation and the machine against it.
About these articles
Packsel Consulting
Purchasing insights · U.S. and Hong Kong
Practical guidance for U.S. businesses buying from Asia.
How we work