What Quality Checks Should a Prepreg Kitting Supplier Carry Out?
The checks a prepreg kitting supplier should perform and record: material certification, freezer and out-time control, cutting accuracy, ply labelling, contamination control and cold-chain shipping.
By Packsel Consulting, Purchasing insights
Article date: · 5 min read
Updated:
A prepreg kitting supplier should check and record six things: incoming material certification, frozen storage and out-time for every roll, cutting accuracy and fibre orientation, ply labelling and traceability, contamination control in the cutting room, and temperature control during shipping. Each check protects a property of the material that is hard or impossible to test after the part is cured.
Prepreg is reinforcement fibre, such as carbon or glass, already impregnated with resin that has been partly cured. It reacts slowly at room temperature, so it is stored frozen and its time out of the freezer is limited. A kitting supplier cuts the prepreg into plies, labels them and packs them into kits in the order they will be laid up. Mistakes at that stage are difficult to see in the finished part.
Check incoming material and certification
Each roll should arrive with the material manufacturer’s certificate of conformance for its batch. The kitting supplier should check:
- The material type and batch against the purchase order.
- The manufacture date and shelf life remaining.
- The certificate’s reported properties, such as resin content, against the material specification.
- That the roll arrived frozen, with a temperature record for the journey if one was required.
Rolls that arrive warm, damaged or without certification should be quarantined, not used.
Control freezer storage and out-time
Two clocks run on every roll: shelf life in the freezer, and out-time (sometimes called out-life) at room temperature. Exceeding either can change how the resin flows and cures.
A good kitting supplier:
- Monitors freezer temperatures continuously, with alarms and records.
- Logs every time a roll leaves and returns to the freezer.
- Lets rolls thaw in their sealed bags before opening, so moisture doesn’t condense on the cold material.
- Tracks the cumulative out-time for each roll and each kit, and passes the remaining out-time on to the customer.
Ask to see the freezer logs and the out-time records for a recent roll.
Check cutting accuracy and fibre orientation
Plies are usually cut on an automated ply cutter from nested patterns. The supplier should check:
- Ply dimensions against the pattern, on a sample from each nest.
- Fibre orientation, marked on each ply, because a ply cut at the wrong angle changes the part’s strength.
- Edge quality: no fraying, crushed fibres or tears.
- That backing papers and films remain in place until layup.
Label and sequence every ply
Each ply should be traceable to its roll and batch and identifiable in the layup sequence. Labels typically show:
- Part and kit number.
- Ply number and sequence.
- Fibre orientation.
- Material batch and roll.
- Kit out-time information.
Kits should be packed in layup order, so the laminator takes plies out in the right sequence.
Control contamination in the cutting room
Prepreg is sensitive to contamination. Silicone, release agents, oils, dust and stray backing film can all cause defects in the cured part. Check that the cutting room controls:
- Temperature and humidity, with records.
- Silicone-containing products and release agents, keeping them away from the material.
- Foreign object debris, with clean cutting tables and controlled tools.
- Gloves and handling, so plies aren’t creased or touched with bare hands.
Pack and ship kits cold
Kits usually ship frozen. Check that the supplier:
- Seals kits in moisture-barrier bags.
- Ships with enough refrigerant or in a refrigerated service for the journey time.
- Includes a temperature data logger, so the customer can confirm the cold chain on arrival.
Quality systems to ask about
Prepreg kitting often serves aerospace, defence, motorsport and wind energy customers, which set their own quality requirements. Aerospace suppliers commonly work to AS9100, and customers may require specific approvals for their material. Ask which quality system the supplier works to and which customer approvals it holds, and check them.
What we look at on a kitting supplier visit
When we visit a kitting supplier, we start at the freezer: its temperature records, alarms and the log of rolls in and out. We follow one roll from the freezer through thawing, cutting and labelling to a finished kit, and compare its records at each step. In the cutting room, we look at the controls on silicone and foreign objects, check a sample of plies against the pattern and orientation marks, and read the labels against the kit list. We finish with packing and shipping: bags, refrigerant, data loggers and the out-time information that travels with the kit.
How Packsel Consulting can help
We verify kitting and composite suppliers in China and across Asia, review their storage, cutting and traceability controls, and inspect kits before shipment. We report what we observed separately from what the supplier stated.
Talk to us about an order. Tell us the material, the parts and the supplier, and which checks you need.
About these articles
Packsel Consulting
Purchasing insights · U.S. and Hong Kong
Practical guidance for U.S. businesses buying from Asia.
How we work