Quality

What Is a Pre-Production Sample (PPS)?

A pre-production sample is made with production materials and methods before mass production starts. Learn what to check on a PPS and how it relates to golden samples.

By Packsel Consulting, Purchasing insights
Article date: · 4 min read
Updated:

A pre-production sample (PPS) is a unit made with the materials, components, and processes intended for mass production, produced before mass production starts. The buyer reviews it to confirm the factory can make the product correctly before the full order is made.

Pre-production samples are common in apparel, consumer goods, electronics, and components. The approved PPS often becomes the golden sample.

How a PPS differs from earlier samples

Earlier samples, such as prototypes or development samples, may be made by hand or with different materials. A PPS should use the production materials, tooling, and processes. That makes it a much better predictor of the order.

What to check on a pre-production sample

  • Materials: do they match the specification?
  • Dimensions: measured against the drawing.
  • Function: does the product work as intended?
  • Appearance: colour, finish, and workmanship.
  • Labels and packaging: content, placement, and quality.
  • Testing: any lab tests required before production.

When to ask for one

Request the PPS after materials and tooling are ready but before the factory starts the full run. Allow time to review it, request changes, and approve a second sample if needed.

Approve it formally

Approve the PPS in writing, listing any changes required. Keep sealed copies for the factory and the inspector. During during-production inspection, check production against it.

Pre-production samples for equipment

For machinery, a pre-production sample is not always practical. Instead, buyers often approve the main components, a frame or structure before assembly, and a recorded factory acceptance test of the first unit. The principle is the same: confirm the production version before the rest is built.

Questions to ask the factory

  1. Was this sample made on the production line, with production materials?
  2. Which suppliers provided the materials and components?
  3. Are there any differences between this sample and the planned production?
  4. How long after approval will production start?
  5. How many samples will you make, so we can keep sealed copies?

How PPS works in apparel

In apparel, the sequence often runs from proto sample, to fit sample, to size set, to pre-production sample, to top of production sample. The PPS uses the actual fabric and trims, and the buyer approves it before bulk cutting.

Common problems

  • A sample made by hand in a sample room, not on the production line.
  • Materials that differ from those ordered for bulk production.
  • Production starting before the sample is approved.
  • No sealed copy kept at the factory.

Consider a hypothetical order where the PPS uses a higher grade of plastic than the production material. Asking where the materials came from before approval would reveal the difference.

How we review pre-production samples

When a PPS arrives, we compare it with the specification and the earlier approved samples, measure it, and check the materials against the bill of materials. We ask the factory whether it was made on the production line, and we list any changes the client needs before approval.

Mistakes to avoid with pre-production samples

  • Approving a sample made in the sample room rather than on the line.
  • Approving without listing the changes needed.
  • Starting production before the sample is formally approved.
  • Keeping only one approved sample.

Pre-production sample approval: a simple sign-off form

Approval works best on a short written form, completed for each product and colour. A form for office products, such as chairs, desks or stationery, might include:

  • Product, SKU and colour.
  • Specification revision and drawing numbers.
  • Materials and components checked against the bill of materials.
  • Measured dimensions against the drawing.
  • Function and assembly results.
  • Labels, packaging and instructions.
  • Test reports received, and any still outstanding.
  • Changes required before production.
  • Decision: approved, approved with changes, or rejected.
  • Name, date and signature for buyer and factory.

Keep the signed form with the sealed samples. It records what was approved and on which basis.

How Packsel Consulting can help

We review pre-production samples with you as part of production oversight and inspect production against the approved sample through quality control.

Talk to us about an order. Tell us what you are buying, where the supplier is, and which stage you have reached.

About these articles

Packsel Consulting

Purchasing insights · U.S. and Hong Kong

Practical guidance for U.S. businesses buying from Asia.

How we work
More insights
  • Quality5 min read

    What Is a Golden Sample in Manufacturing?

    A golden sample is the approved unit that sets the standard for mass production. Learn what it is, how it differs from other samples, and how buyers use it in inspections.

  • Quality4 min read

    What Is a During Production Inspection (DUPRO)?

    A during production inspection checks goods while an order is being made, so problems can be fixed before the whole order is finished. Learn when to book one and what it covers.

  • Quality5 min read

    How to Verify a Kitchen Supplier in China

    Learn how to verify a kitchen supplier in China through company checks, production evidence and an in-person factory visit before ordering.

Get in touch

Tell us what you’re buying.

Send us the product, the supplier if you have one, and your dates. We’ll suggest a scope for one stage or the whole order.